Natatorium pool to re-open soon
Equipment that keep the pool maintain such as, filter, heater and circulation system sit on the basement of the Natatorium pool at Yokota Air Base, Japan, Jan. 23, 2019. The 374th Civil Engineer Squadron along with the contractor have been working to fix damaged equipment, but also to protect them in the future. (U.S. Air Force photo by Machiko Arita)
PHOTO BY:
Machiko Arita
VIRIN:
190123-F-DY012-0018.JPG
FULL SIZE:
2.11 MB
CAMERA
N/A
LENS
N/A
APERTURE
N/A
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.