Photos

Keyword: Category: Tag: Sort By:
A bucket filled with hydraulic fluid hangs from part of a C-130 Hercules propeller at Yokota Air Base, Japan, Oct. 8, 2015. During the 14-day phase dock process, Airmen inspect the aircraft and fix approximately 1,000 discrepancies. (U.S. Air Force photo by Senior Airman David Owsianka/Released)


Phase docks go paperless, improve process

A bucket filled with hydraulic fluid hangs from part of a C-130 Hercules propeller at Yokota Air Base, Japan, Oct. 8, 2015. During the 14-day phase dock process, Airmen inspect the aircraft and fix approximately 1,000 discrepancies. (U.S. Air Force photo by Senior Airman David Owsianka/Released)

Related Imagery
Senior Airman David OwsiankaReleased
151008-F-CB366-024.JPG

DOWNLOAD PHOTO
(2.78 MB)



Tags
c-130 hercules, aircraft



< Back to Main Gallery